It has been decided that WWC would be placing an order of 2 of these new supersonic transport aircraft. There are still a few glitches, but the designer of the aircraft says, that these would be sorted out soon, and as soon as that happens, we ould receive our 2 aircraft. At this stage it is still not known as to the costs of the aircraft.